55m×51m=2,805㎡
Client company: KOBE-YA SHOKUHIN KOUGYO CO.,LTD
Construction year: 2021
Outline: Installation work of solar power generation equipment on the roof of the head office building / Electric power generation capacity=41.8kw
W=2.0m×L=26.85m = 53.7㎡
Client company: SANWA METAL(THAILAND) CO.,LTD
Construction year: 2021
Outline: Extension of raw material storage warehouse to existing factory / W=2.0m×L=26.85m = 53.7㎡
4m×11.5m=46㎡
Client company: KOMERI (THAILAND) CO.,LTD
Construction year: 2021
Outline: Home center new construction / Site Area:5,290㎡ / Store Area:1,455㎡ / Parking Lot:47cars / Motorcycle Parking Lot:27Motorcycles
55m×51m=2,805㎡
Client company: KOBE-YA SHOKUHIN KOUGYO CO.,LTD
Construction year: 2021
Outline: Installation of disinfectant spray booth / Vehicle entry / exit management automatic gate installation / Installation of taxiway barricades for entrance and exit
8.5m×25m=212.5㎡
Client company: ASIAN DECAL TRADING CO.,LTD
Construction year: 2021
Outline: Office building rooftop solar power generation equipment installation work / Electric power generation capacity=41.8kw
55m×51m=2,805㎡
Client company: DENSO TEN
Construction year: 2017-2018
Outline: Total floor area 55m x 51m = 2,805㎡(including additional work)
8.5m×25m=212.5㎡
Client company: DENSO TEN
Construction year: 2018
Outline: Total floor area 8.5m×25m=212.5㎡
4m×11.5m=46㎡
Client company: Kosei Aluminum
Construction year: 2018
Outline: Total floor area 4m×11.5m=46㎡
-
Client company: KATO WORKS
Construction year: 2018
Overview:-
21m×30m=630㎡
Client company: DENSO TEN
Construction year: 2019
Outline: Total floor area 21m×30m=630㎡
15m×30m=450㎡
Client company: DENSO TEN
Construction year: 2020
Outline: Total floor area 15m×30m=450㎡
3m×5m=15㎡ / 3m×8m=24㎡
Client company: DENSO TEN
Construction year: 2019
Outline: 3m×5m=15㎡ / 3m×8m=24㎡
8m×12m=96㎡
Client company: Ando Corporation (Pakse Laos)
Construction year: 2020
Outline: Total floor area 8m×12m=96㎡
Office space 878㎡ / Refrigeration/Frozen area 91㎡ / Parking lot 154㎡
Client company: KOBE-YA SHOKUHIN KOGYO
Construction year: 2020
Outline: Total floor area Office space 878㎡ / Refrigeration/Frozen area 91㎡ / Parking lot 154㎡